This document illustrates multiple blades configurations using bare-metal configurations and converting them to virtualized ones. The goal is to illustrate the value of virtualization and detail cost and associated power improvements.
There are three configurations discussed:
- Configuration 1: x64, bare-metal – Four HP ProLiant BL460c G6 server blades
- Configuration 2: x64, virtualized – Five HP ProLiant BL460c G6 server blades
- Configuration 3: x86, virtualized – Four HP ProLiant BL460c G6 server blades
But I think that even with just these two images they tell the story quite succinctly?
Figure 1. Reference configuration 1 – Four bare-metal HP ProLiant BL460c G6 server blades (x64) – 1,608 users
Figure 2. Reference configuration 2 – Five virtualized HP ProLiant BL460c G6 server blades (x64) – 1,700 users

July 1st, 2009 at 11:37 am
I am a total newby about this. Appreciate getting some important details I was missing.